Thursday, March 02, 2006



Here is a photo from Monday 2-27-06 theater progress. Brick will cover the face of the metal building across the front and around the sides. The sides will be bricked back about 20 feet at th front and a product that I call Stucco will cover the exposed metal.

We cannot see it yet, but as the brick goes up the front, there will be features added that will simulate window openings like those showing on the building on the right.

No comments: